McMeekin Power Station

In preparation for the Saluda Dam remediation project, South Carolina Electric & Gas contracted with Thalle to redevelop the existing power plant facilities.

The project called for more than 150,000 cubic yards of excavation, relocation of existing utilities, large diameter pipe installation and extensive concrete construction. The project also called for installation of a dry ash handling system and relocation of existing ash ponds.