Gilboa Dam

Clearing and grubbing of the site including the removal of trees.
Site construction roads, guiderail, temporary stream crossings, access gates, vehicle/equipment staging areas, and soils stockpiling area. Grading and paving of roads and staging areas.
Installation of permanent site access roads. Furnishing and installing environmental controls, temporary site fencing and gates; temporary water, sanitary, lighting, power, and stormwater utilities; a temporary bridge; water supply wells; development and implementation of a stormwater pollution prevention plans; operation and maintenance of existing siphons for the duration of the contract to facilitate the installation of the crest gates; furnishing and installing  dust, soil erosion and sedimentation control features.

The Gilboa Dam Preparatory Project was completed in July of 2011.