Hanes Mill Landfill

Erosion and settlement repairs to the existing closed landfill, as well as construction of two new landfill cells, adding approximately 17 acres to the active landfill.

Significant scope items included:

  • 780,000 cubic yards of excavation.
  • A 1.5 foot compacted soil liner.
  • A geosynthetic liner system.
  • An HDPE leachate collection system.
  • A crushed stone collection layer.
  • Operational cover.

This project was completed in July of 2011.